CCP Engineering
  • COMPANY
    • ABOUT US
    • OUR PEOPLE
    • FEE STRUCTURE
  • CONTACT US
  • SERVICES
    • INDUSTRIAL SAFETY >
      • PRE-START HEALTH & SAFETY REVIEW
      • CUSTOM MACHINE GUARD DESIGN
      • FIRE SAFETY
      • FLAMMABLE & COMBUSTIBLE LIQUID HAZARDS
      • COMBUSTIBLE DUSTS
    • FORENSIC ENGINEERING & LITIGATION SUPPORT
    • DUST COLLECTOR ENGINEERING
    • AREA CLASSIFICATION - HAZARDOUS LOCATIONS
    • DESIGN, STRUCTURAL ANALYSIS & FEA
    • CONSTRUCTION SAFETY
    • SAFETY PROGRAM DEVELOPMENT
    • GENERAL ENGINEERING SERVICES
  • LINKS
  • BLOG / NEWS
  • LEGAL
  • CAREERS

MOL Fines Increased On Dec.14th, 2017

12/22/2017

0 Comments

 

Major changes have been made through Bill 177. They include:

- Raising the maximum corporate fine from $500,000 per charge to $1,500,000 per charge (+25% victim surcharge),
- Raising the maximum individual fine from $25,000 per charge to $100,000 per charge (+25% victim surcharge),
- Expanding the limitation period for bringing a prosecution from 'one year from the alleged contravention' to 'one year from the date that an MOL Inspector became aware of the alleged contravention'.
- A requirement to report a structural inadequacy to the MOL when brought to the company's attention by a H&S representative or committee.


Follow this LINK for an excellent article written by J.Warning and C.A.Edwards, who are Partners at MathewsDinsdale in Toronto.

0 Comments

    Categories

    All
    Best Practice
    Regulatory

    Archives

    July 2022
    October 2021
    September 2020
    November 2019
    October 2018
    December 2017
    March 2017
    December 2016
    January 2016
    June 2015
    March 2015
    January 2015
    March 2014
    January 2014
    November 2013

OFFICE ADDRESS:
CCP Engineering Inc.

50 Steeles Ave. East, Unit 9,
Milton, Ontario L9T 4W9
Canada
MAILING ADDRESS:
CCP Engineering Inc.

160 Luella Crescent,
Brampton, Ontario L7A 3H8

Canada
Picture
Picture
Picture
Picture

© CCP Engineering Inc.